Construction Management

You're not just building a solar PV system but building it right!

Construction Management

Commercial Solar System Design

In Solar Construction, the Details Matter! Why?

Because construction management is more than just overseeing work on-site. It involves careful planning and detailed quality checks, to ensure that the installation is top-notch.

Unfortunately, EPCs often struggle to find companies that can deliver this level of comprehensive service. But with Illumine-i, you don't need to look any further!

Here, the approach is holistic. Starting from planning to handover, we help our clients deliver projects that are efficient, compliant, and environmentally responsible.

The scope of services includes preparation of precise Bill of Materials, rigorous QA Protocols, RFP Management and many more.

Rigorous Quality Control

At Illumine-i, quality is central to every project.
Our Quality Assurance Plan (QAP) is designed to ensure that your solar PV system is built to the highest standards.

This is how we achieve it:

- Conducting thorough inspections at every stage with the help of photos and video, from initial phase to final acceptance. This includes but not limited to validation of material inspection reports, module placements, and as-built vs design comparison, to confirm everything is compliant and reliable.

- Maintaining detailed records of our quality checks, inspections, and corrective actions. This documentation not only complies but also provides a valuable resource for future maintenance and audits.

- Comprehensive training programs are provided as ongoing L&D programs for our technical expertise, to keep them updated on the latest industry standards, safety protocols, and innovative practices, ensuring they have the knowledge and skills to maintain exceptional quality.

Commercial Solar System Design

Drone-Based Construction Monitoring

Commercial Solar System Design

Drones give a unique perspective on solar projects, allowing for real-time monitoring and quality control. We use this technology to:

A. Survey the project site, track construction progress, and inspect for quality assurance.

B. Spot safety risks and verify compliance with environmental guidelines to keep your project safe and on track.

C. Collaborate with stakeholders remotely, making decision-making possible throughout the project's lifecycle.


The Final Inspection and Punchout
Before commissioning, your project must qualify for a final inspection. Illumine-i ensures this step is straightforward by:

- Compiling a detailed punchout list of outstanding issues, coordinating with contractors and project teams to resolve them swiftly.

- Documenting the inspection results, ensuring all compliance requirements are met, and providing a complete record of the project's final stage.

- Coordinating follow-up inspections to confirm that all punchout tasks are completed and the project is ready for commissioning and handover.


Without a doubt, Illumine-i is your dedicated partner to construct solar assets to the highest standards, on-time & within budget.

Schedule your consultation now!

Frequently Asked Questions

1. How crucial is the Bill of Materials (BOM) and planning in solar PV projects?

The Bill of Materials (BOM) is crucial in solar PV projects because it lists all components and materials needed for the system. It promises efficient procurement, construction, and operation by providing a clear guide for what is needed, reducing delays, and helping retain the project's design specifications.

2. What are the key considerations for label design in a solar PV project?

Labels in a solar PV project should be clear, durable, weather-resistant, and easily readable. Proper label design reduces risks and promotes smooth operations. They should include essential information such as equipment identification, warning symbols, voltage and current ratings, and disconnect instructions adhering to applicable standards. This supports safety, eases maintenance, and regulatory compliance.

3. What are the key responsibilities of a construction manager in solar PV projects?

The key responsibilities of a construction manager in solar PV projects include project planning, resource allocation, contractor management, scheduling, quality control, safety oversight, and ensuring compliance with regulations and contractual agreements.

4. How does construction management contribute to project efficiency?

By coordinating logistics, managing subcontractors, and implementing effective project controls, construction management minimizes delays, optimizes resource utilization, and reduces construction costs, thereby increasing the efficiency of projects.

5. What are the common challenges in construction management for solar PV projects?

Some of the common challenges in construction management in line with solar PV projects include weather delays, logistical constraints, regulatory compliance issues, site-specific challenges and maintaining safety standards in dynamic construction environments.